Warsaw 15 ºC
联系我们
bolan.travel旅游胜地纪念碑Cast iron hanging bridge over the Mała Panew in Ozimek

Cast iron hanging bridge over the Mała Panew in Ozimek


一般

单位类型:

Bridge built in 1827 in Małapanew ironworks in Ozimek; it was the first iron suspension bridge in Europe.

Dimensions: 30 m long and 6 m wide. Its construction used 14 t of forged iron and more than 53 t of iron castings. Currently, it is behind the gate to Małapanew ironworks. The plant has been active for 250 years, and therefore unfettered access to the area is prohibited. Bridge can be seen from outside the fence (located approximately 30 metres from the gate). Groups of few tourist may visit the facility upon appointment (tel. +48 77 40 18 524). After an extensive renovation in September 2010, it was re-opened and put to use.

localization-img位置图:


Hutnicza
Ozimek
省: OPOLSKIE
经纬度: 50.6765022278,18.2124996185

办事处地址

814 Guoya Plaza
Yabao Road 1, Beijing 100020, China
tel. +86 10 6525 5600, 
fax +86 10 6525 5608
beijng@pot.gov.pl

关于办事处